| Sign In | Join Free | My autochinanet.com |
|
Brand Name : LionRock
Model Number : All-in-one combined 40ft
Place of Origin : Dongguan China
MOQ : negotiate
Price : negotiate
Payment Terms : TT
Delivery Time : negotiate
Packaging Details : export packing
DCIM : OwlEye
Container Dimensions : 12192 x 2438 x 2896
Container Weight (Fully Equipped) : <25
Access Control : Electronic lock with IC card reader
Working / Storage Temperature: °C : -20 to 453 / -40 to 70
Protection Level : IP55
Container Dimensions Data Center , DCIM Modular Data Center Construction
Power Module1
The power module is a single ISO40HC container with four levels of power capacity that can be upgraded from the basic configuration to
480kW ICT load capacity in steps of 120kW each. Internal arrangement has been designed to allow the upgrade by installing additional power
equipment. Multiple Power Modules can be combined to support even high ICT load.
ICT Module1
Two ICT module designs are available to suit different cabinet depth. They can be combined in different configurations to meet various
operation requirements. Expansion is easy just by adding more modules. Combined with the Power module, there is always a configuration
that meet your requirement.

General Specifications
| Fire Protection | Type | Automatic fire detection (smoke and heat) with gas suppression system (HFC-227ea) |
| Monitoring and Management | Access Control | Electronic lock with IC card reader |
| Monitoring | Video: Infrared IP cameras Data: PDF, UPS, DC, A/C, Temp & Hum, fire protection, access control and ventilation | |
| HMI | Touch screen | |
| Remote Access | Web, App | |
| Notification | SMS, email | |
| DCIM | OwlEye | |
| Structure | Container Dimensions (W x D x H): mm | 12192 x 2438 x 2896 (ISO40HC) |
| Container Weight (Fully Equipped): T | <25 | |
| Protection Level | IP552 | |
| Environmental Conditions | Working / Storage Temperature: °C | -20 to 453 / -40 to 70 |
| Humidity: % | 5 to 95 | |
| Altitude: m | ≤4000 (derating start >1000) | |
| Corrosion | Class C (500m away from seashore) |
Notes:
1 - Consult 3Tech for customized versions with Tier 3 reliability level or different ICT design load.
2 - Optional IP65 protection level.
3 - Optional maximum temperature up to 55°C.
|
|
Container Dimension Data Center , DCIM Modular Data Center Construction Images |